Paper/Nano Technology Books
Micro and Nanotechnology in Paper Manufacturing
Author- Dr. Mahendra Patel, (530 pages ); ISBN No. 978-81-923542-2-4);
Price: $ (USA) 120 + delivery charge
Minerals in Paper Manufacturing
(Author- Dr. Mahendra Patel, 32 chapters, 350 pages ; ISBN No. 978-81-923542-1-7).
Price: $ (USA) 65 + delivery charge
Operations and Recycling in Paper Mills with Micro and Nano Concepts
Author- Dr. Mahendra Patel; (22 chapters- 500 pages); ISBN No.978-81-923542-3-1)
Price: $ (USA) 150 + delivery charge
Materials for
Better Productivity in Pulp and Paper Mills: Metals and Polymers
(Author: Dr. Mahendra
Patel; 616 pages; 36 chapters; ISBN No.978-81-923542-5-5)
Price- US $230+
Cost of dispatch.
Ceramics in Paper Manufacturing
including Advanced and Nano Materials
(Author: Dr.
Mahendra Patel, 420 pages; 32 chapters, ISBN No: 978-81-923542-4-8.)
Price: $ (USA) 220 + delivery charge
Contact: industrypaper@yahoo.co.uk
patel@nanoindustry.in
:Tel:91(0)9871787870
Payment possible through Paypal/Bank transfer/Cheque
Up to 30% reduction to specialised Organisations/Individuals
Sent by Registered Airmail through Post office after confirmation of payment
Nanotechnology Update
Pulp, Paper and Packaging industries
07/02/2010
Bubbling fluidized bed (BFB) technology
Metso will deliver energy and pulping technology for CMPC Celulosa S.A., Chile; the value of the order is approximately EUR 60 million. The delivery includes a new biomass fired power boiler, a conversion of an existing recovery boiler to a biomass fired boiler, a digester rebuild and a brown stock washing upgrade. The new power boiler, as well as power boiler conversion, will utilize bubbling fluidized bed (BFB) technology. The new power boiler will be part of CMPC’s Santa Fe pulp mill’s energy project for green energy generation.Rebuild of an existing recovery boiler into a biomass fuelled power boiler, as well as a digester rebuild and brown stock washing upgrade, including the installation of the press technology, are part of the Laja Mill modernization project. The commercial operation is scheduled to start in 2011-2012.

|
|
22 | 23 | 24 | 25 | 26 | 27 | 28 |
1 | 2 | 3 | 4 | 5 | 6 | 7 |
8 | 9 | 10 | 11 | 12 | 13 | 14 |
15 | 16 | 17 | 18 | 19 | 20 | 21 |
22 | 23 | 24 | 25 | 26 | 27 | 28 |
29 | 30 | 31 | 1 | 2 | 3 | 4 |